A. Upon receipt of the design requirements from the department of public works, the petitioner shall cause the plans and specifications for the extension to be prepared. All design and construction drawings and specifications shall be in accordance with engineering standards adopted by the department of public works. The completed design and specifications, having a valid professional engineer’s seal and endorsement, shall be submitted to the department of public works for review and approval.

B. The project for main construction will be carried out in accordance with the provisions of a contract entered into between the city and the petitioner. At the discretion of the director of public works, appropriate security may be required covering construction performance and guaranteeing the construction after completion for a period of one year.

C. After approval of the design and construction details, the department of public works shall provide the petitioner with an estimate of the construction inspection fee. A permit for construction will be issued after the inspection fees and estimated main connection charges have been deposited with the finance director. [Ord. 9234 § 6, 1983; Ord. 8982 § 21, 1981].