Skip to main content
Loading…
This section is included in your selections.

Applicants shall demonstrate that all reasonable efforts have been examined with the intent to avoid and minimize impacts to critical areas and buffers. When an alteration to a critical area is proposed, applicants shall follow the mitigation sequential order of preference below:

A. Avoiding the impact altogether by not taking a certain action or parts of an action;

B. Minimizing impacts by limiting the degree or magnitude of the action and its implementation, by using appropriate technology, or by taking affirmative steps, such as project redesign, relocation, or timing, to avoid or reduce impacts;

C. Rectifying the impact to wetlands, critical aquifer recharge areas, frequently flooded areas, and habitat conservation areas by repairing, rehabilitating, or restoring the affected environment to the historical conditions or the conditions existing at the time of the initiation of the project;

D. Minimizing or eliminating the hazard by restoring or stabilizing the hazard area through engineered or other methods;

E. Reducing or eliminating the impact or hazard over time by preservation and maintenance operations during the life of the action;

F. Compensating for the impact to wetlands, critical aquifer recharge areas, frequently flooded areas, and habitat conservation areas by replacing, enhancing, or providing substitute resources or environments; and

G. Monitoring the hazard or other required mitigation and taking remedial action when necessary.

Mitigation for individual actions may include a combination of the above measures. [Ord. 2016-02-005 § 16; Ord. 2005-11-092].