A. Permit Requirements – Compliance. No regulated activity may be conducted within a regulated wetland or wetland buffer without a permit from the director.

B. Permit Applications. An application for a permit for a regulated activity shall include:

1. A description and purpose of the project and a description of how the project has avoided/minimized impacts to wetlands and buffers.

2. A wetland delineation report, in accordance with BMC 16.55.290.

3. Site plans depicting the entire parcel, drawn to scale, showing the following:

a. The location and dimensions of all proposed and existing buildings, roads, utilities, stormwater facilities and other constructed or installed features.

4. Site plans depicting the location, extent (specific quantities), and methods of all clearing, grading, dredging, or drainage alterations for such activities, including:

a. Before and after topography at two-foot contours.

b. Drainage alterations.

5. A wetland mitigation plan in accordance with BMC 16.55.260.

6. The director may require additional information deemed necessary to verify compliance or to evaluate the proposed use with the provisions of this chapter. [Ord. 2016-02-005 § 21; Ord. 2005-11-092].