Skip to main content
Loading…
20.00.020 Birchwood neighborhood table of zoning regulations.
This section is included in your selections.

BIRCHWOOD NEIGHBORHOOD ZONING MAP

Areas 1 – 29

Area

Zoning

Use Qualifier

Density

Special Conditions

Prerequisite Considerations

Special Regulations

1

Residential Single

Detached, mixed

20,000 sq. ft. minimum detached lot size

None

None

The mixed designation is intended to allow agriculture and the raising of farm animals; provided, that they are not a commercial endeavor. The latter must have the approval of the Bellingham/Whatcom County health department.

2

Residential Single

Detached

7,200 sq. ft. minimum detached lot size

Buffer Interstate 5

None

None

3

Residential Multi

Multiple

High

Preserve Alderwood right-of-way

None

None

4

This area has been deleted

5

Residential Multi

Planned

High

Access

None

None

6

Commercial

Neighborhood

7,500 sq. ft. maximum building size

None

W. Maplewood improvements

None

7

Residential Multi

Planned (Resos. 21‑84, 43‑84, 40‑85, 45‑85, 51‑85)

High

Access; buffer all single-family structures

Improvement of W. Maplewood arterial to recommended standards should occur prior to additional apartment development.

None

7A

Residential Multi

Planned

High

Access; buffer all single-family areas with fencing and landscaping; residential multi interior side setbacks

Improvement of W. Maplewood arterial to recommended standards should occur prior to additional apartment development. The adequacy of the reclamation of the coal mine site as it relates to public safety should be proven before any development is allowed.

Building and parking areas shall use residential multi setback requirements.

Wooden fences six feet high along the rear property line shall be required during site plan review.

8

Public

School

N/A

None

None

None

9

Public

School

N/A

None

None

None

10

Commercial

Planned (Ord. 9017; Resos. 45‑84, 77‑84, 40‑85; PC 87-6)

None specified

Shoreline; clearing; screen

Improvement of W. Maplewood to recommended standards should occur before additional development is allowed on properties fronting the street. The adequacy of the reclamation of the coal mine site as it relates to public safety should be proven before any development is allowed.

None

11

Residential Multi

Planned (Res. 71-83)

High

Flood; shoreline; access to Birchwood limited; buffering

Improvement of Birchwood/Meridian intersection. The adequacy of the reclamation of the coal mine site as it relates to public safety should be proven before any development is allowed.

None

12

Residential Single

Detached

10,000 sq. ft. minimum detached lot size

Little Squalicum channel

None

None

13

Public

School

N/A

Parking; access

None

None

13A

Public

School

N/A

Parking; access; drainage

Relocation of primary access; improvement of W. Illinois St.; pedestrian and bike access easement.

None

13B

Public

School

N/A

Parking; access; drainage

None

None

14

Residential Multi

Transition

Medium for transition; Single-family – 4,000 sq. ft. minimum detached lot size

Shoreline; Roeder right-of-way

Improved access

See neighborhood plan for density discussion.

15

Industrial

Planned

N/A

Shoreline; Roeder right-of-way; flood; buffer

None

None

16

Residential Single

Detached

7,200 sq. ft. minimum detached lot size

Access, view

None

None

17

Residential Multi

Transition

Low

One access per existing lot; view; shoreline

None

None

18

Public

Park

N/A

Squalicum Creek Park Master Plan

Squalicum Creek Park Master Plan

None

19

Residential Single

Detached

20,000 sq. ft. minimum detached lot size

Shoreline; clearing; access to Squalicum Pkwy.; buffer creek and parkway

Completion of Floodplain Management Study by HUD

None

20

Residential Single

Detached

20,000 sq. ft. minimum detached lot size

Shoreline; clearing; access to Squalicum Pkwy.; buffer creek and parkway

Completion of Floodplain Management Study by HUD

None

21

Residential Multi

Planned

High

Traffic

None

None

22

Commercial

Planned

None specified

None

Sewer

None

23

Public

Governmental Services

N/A

None

None

None

24

Public

Park

N/A

Squalicum Creek Park Master Plan

Squalicum Creek Park Master Plan

None

25

Residential Multi

Planned

High

Critical areas

Provide sidewalks and bicycle lanes per Bellingham’s Pedestrian and Bicycle Master Plans

Provide public trails as indicated in the Bellingham Comprehensive Plan

26

Industrial

Planned*

N/A

Critical areas

Provide sidewalks and bicycle lanes per Bellingham’s Pedestrian and Bicycle Master Plans

Provide public trails as indicated in the Bellingham Comprehensive Plan

Utility services may need to be extended or upgraded to support new development

*Hotel and motel establishments, and retail parking facilities are also permitted

Expansion of any nonconforming use shall require planned development approval

27

Industrial

Planned*

N/A

Critical areas

Project-specific Transportation Impact Analysis may be required

Provide sidewalks and bicycle lanes per Bellingham’s Pedestrian and Bicycle Master Plans

Provide public trails as indicated in the Bellingham Comprehensive Plan

Utility services may need to be extended or upgraded to support new development

*Retail sales are prohibited, except when associated with industrial uses on site

Expansion of any nonconforming use shall require planned development approval

28

Public

Park/Open Space

N/A

Critical areas

Maplewood/McLeod Park Master Plan

29

Public

Park

N/A

None

None

[Ord. 2022-11-025 § 8 (Exh. A); Ord. 2021-10-044 §§ 23 (Exh. A), 24 (Exh. B); Ord. 2021-10-040 §§ 7, 9; Ord. 2018-11-027 §§ 6 (Exh. E), 7 (Exh. F); Ord. 2005-12-105; Ord. 2004-12-087].