A. Review Criteria. Specific binding site plan applications shall be approved upon finding by the PCDD and public works director that all of the following have been satisfied:

1. The checkprints conform to Chapter 23.36 BMC;

2. All conditions of the general binding site plan approval have been completed and accepted by the city or, if the specific binding site plan is proposed to be recorded concurrently with the general binding site, all construction related permits to meet the terms and conditions of the general binding site plan permit have been issued by the city;

3. Unless the specific binding site plan is proposed to be recorded concurrently with the general binding site plan, the record drawings associated with the construction of any infrastructure required by the general site plan approval have been submitted to and accepted by the city. If concurrent recording of the specific and general binding site plans is proposed, the record drawings shall be submitted to and accepted by the city prior to issuance of a certificate of occupancy;

4. All financial sureties for maintenance or any uncompleted work have been submitted and accepted by the city;

5. Required easements, deeds, covenants, and any other formal documents required by the general binding site plan permit approval have been prepared in accordance with this title and submitted and accepted by the city; and

6. The specific binding site plan conforms to state law, Chapter 58.17 RCW.

B. Notice of Approval. The director will notify the applicant when the city determines the checkprints conform to this title and the general binding site plan and the city will accept mylars for city approval.

C. Final Action. Upon receipt of the mylars, the city will sign the mylar document as an acknowledgment that the above criteria for specific binding site plan approval have been met. [Ord. 2018-12-036 § 2 (Exh. A)].